Do you have any questions? Need help?Call us +48 518 075 074

Below is one of the measurement examples for Venetian Blinds C80/Z90

variant 3

Installation in a recess, concealed guides, built-in or unbuilt sheet metal

 


S = Recess width

To measure the width, we provide the dimension of the recess, i.e. the outer, extreme dimension of the window recess.
ATTENTION! This is not the total width of the blinds with guides as in the case of other installation methods!

H = blind height

Measuring the height of the blinds using slatted guides with a cover sheet. When ordering, we provide the total height H, i.e. the outermost dimension from the bottom of the guide to the end (upper part) of the blind. Please note that the cover sheet only covers the upper part of the slats and does not increase the entire dimension of the blinds


Installation in a recess, flush-mounted guides – width measurement

Measuring the width of the blinds when installing them in the window recess. using a built-in cover sheet.

WN – recess width


Installation in a recess, flush-mounted guides – height measurement


Venetian Blinds c80 – dimensions and depth of the cassette

Measuring the width of the blinds when installing them in the window recess. using a built-in cover sheet.
P – Height of the slat package
B – Height of the cover plate
G – Depth of main handle (12cm)
S – Length of the guide handle


Venetian Blinds c80 – dimensions and depth of the cassette

Measuring the width of the blinds when installing them in the window recess. using a built-in cover sheet.
P – Height of the slat package
B – Height of the cover plate
G – Depth of the main handle and cover plate (12cm)
F – Insulation layer, e.g. 1-2 cm
S – Length of the guide handle
R – A layer of insulation, e.g. 1-2 cm, glued to the front of the cover sheet


Venetian Blinds z90 – cassette dimensions and depth

Measuring the width of the blinds when installing them in the window recess. using built-in protective sheets

P – Height of the slat package
B – Height of the cover plate
G – Depth of the main handle and cover plate (14cm)
F – Insulation layer, e.g. 1-2 cm
S – Length of the guide handle
R – A layer of insulation, e.g. 1-2 cm, glued to the front of the cover sheet


Venetian Blinds z90 – cassette dimensions and depth

P – Height of the slat package
B – Height of the cover plate
G – Depth of the main handle and cover plate (12cm)
S – Length of the guide handle


Concealed guide system:

1 – Mounting profile,
2 – Concealed guide,
3 – Gasket,
4 – Plaster / Warming,
5 – Concrete / Masonry.

Installation guidelines:

The use of a concealed guide system is recommended when installing a blind system in deep window recesses. Its use does not reduce the light of the window opening compared to other guide systems. When using a system with a concealed guide, only a sheet metal cover is available without side covers, the width of the cover is equal to the width of the window recess.


Installation of the mounting profile in the window recess.

Guidelines for mounting the mounting profile:

– The length of the installed profile is equal to the full height of the blinds – 50 mm.
– Installation of the profile in the window recess is shown in Fig. 2.
– The installation of the profile must ensure its immobile mounting to the ground and its linearity and perpendicularity in relation to the blind system. If the mounting profile is embedded in a surface that does not provide sufficient stability, it is necessary to construct a substructure supporting the mounting profile and ensuring its appropriate stability and linearity and perpendicularity in relation to the blind system.
– Profiles must be installed parallel to each other in all planes.
– The installation must ensure that the upper edge of the mounting profile is flush with the surface of the plaster/insulation or finishing treatment of the recess, and flush with the upper plane of the cover sheet.
– Mechanical anchoring of the mounting profile is allowed so that the fastening element does not protrude more than 4 ÷ 5 mm above the internal surface of the profile, Fig. 3.
– When installing the profile, it should be protected against damage or dirt as a result of assembly or finishing work.


Method of mounting the mounting profile:

1 – Mounting profile,
2 – Concealed guide,
3 – Gasket,
4 – Plaster / Warming,
5 – Concrete / Masonry.

NOTE: The use of a concealed guide system requires preliminary preparation of the facility for the installation of blind systems. The buyer is obliged to properly install the mounting profile on his own.

 


Pomiar szerokości systemu z prowadnicą podtynkową:

– Pomiarów dokonujemy od górnej krawędzi profilu montażowego licującego się z tynkiem / obróbką wykańczającą wnękę okienną.
– Dla systemu pojedynczego szerokość systemu przedstawia rys. a).
– System modułowy podwójny i wielomodułowy wymaga określenia podziału modułu żaluzji, znajduje się on w osi prowadnicy podwójnej, systemy przedstawia rys. b) i c).
– Dla każdej żaluzji / modułu żaluzji należy dokonać minimum 3 pomiarów, na końcach prowadnicy oraz w środku długości prowadnicy.
– Dla systemu pojedynczej żaluzji podajemy szerokość żaluzji L max.
– Dla systemu modułowego podwójnego / wielomodułowego podajemy szerokość całkowitą systemu żaluzji WN i długość poszczególnych modułów żaluzji S 1 , S 2 ,S 3 , S … .
– Przed przystąpieniem do montażu żaluzji należy odmierzyć i zaznaczyć położenie głównych uchwytów montażowych
blachy osłonowej w takim miejscu, aby nie kolidowały później z mechanizmami zwijającymi i silnikiem.


Installation of blinds in modular versions

Width measurement during modular installation in the window recess – Installation of external flush-mounted guides – Installation of the central guide to the window frame using a telescopic handle

Width measurement – Example of using different handles

WN WIDTH the sum of WN, i.e. the dimension of both blinds with guides (up to the central axis of the guide) to the edge of the recess (without taking into account under-plaster guides)

Handles used:

Type 2 – telescopic(for mounting the modular guide to the window frame)

  • 50-70mm
  • 70-105mm
  • 100-170mm

Extreme guides flush-mounted to the wall:

 


Zapisz do PDF

Trwa generowanie dokumentu, poczekaj chwilę

Back Zapisz do PDF
Your cart email sent successfully :)